• 欢迎访问(88简历网),记住本站网址:www.88jianli.com
当前位置:88简历网简历大全简历大全英文简历模板机械设计及制造英文简历» 正文

机械设计及制造英文简历

[10-20 21:06:36]   来源:http://www.88jianli.com  英文简历模板   阅读:280

概要: Educational Background Name of School: ShenYang Aeronautical Institute of Engineering Highest Degree: Bachelor Date of Graduation: 1999-07-01 Name of Major 1: Mecanical Designing and Manufacturing Name of Major 2: Education experience: Start dateEnd dateEducation organizationMajorsCertificateCertificate No1993-091999-07ShenYang Aeronautical Institute of EngineeringMecani

机械设计及制造英文简历,标签:英文简历范文,英文简历范本,http://www.88jianli.com
Educational Background
Name of School: ShenYang Aeronautical Institute of Engineering
Highest Degree: Bachelor Date of Graduation: 1999-07-01
Name of Major 1: Mecanical Designing and Manufacturing Name of Major 2:
Education experience:
Start dateEnd dateEducation organizationMajorsCertificateCertificate No
1993-091999-07ShenYang Aeronautical Institute of EngineeringMecanical Designing and ManufacturingBachelor
2006-052006-09Inside training of MIDEA GROUPBEC oral English
2006-052006-05SZ Li Chuang consulting Co.TPM/LEAN
2007-012007-08Couples of training companiesAbroad engineering management,and so onA few certificates
2007-122008-01One consultancy company of ShaihaiERP/OA system
Language Ability
Foreign Language: English Level: good
Chinese level: good Cantonese Level: poor
Relevant skills and abilities
Engineering and facility installation supervision and management;
Purchasing management;Type-election,negotiation,search quotation,compile contract,suppliers management and so on.
Equipment troubleshooting and inspection daily/weekly/monthly.
Compile maintenance and troubleshooting plan.
Compile spareparts plan.
work out facility management regulations.
Self-recommendation letter
My project management experience:

2008/04 -- 2009/04:Eckart(Zhuhai) plant's construction project
Responsibilities(your responsibilities and achievements):Work as civil construction and facility installation supervisor at siteProject Description(goals, scales, etc):Civil construction;
Facility installation;Report to inspection;Test and Adjust;Invite the relevent Bureau to examin and accept this project;Rectificatin;Trial production.
I participated the following projects:
Civil engineering:construction;Water-proof project;Fire-fighting;Industrial CWS,life-water,fire-fighting water system installation;Thunder-proof items;Ex-proof lightening and on/off system;Anti-static system and so on.
Installation engineering:
HVAC;Chemical Lab;Water pump station;Air-compressing system;Power room and electrical distribution;Instrument and ballance installation;Chemical facilities and process pipes mounting,Crane mounting;vacuum system mounting and so on.
Reporting to construction and inspection by bureau.
Rectification afterwards.

2006/10 -- 2007/06:Window machine and multi-in-1 machine productive lines installation item
Responsibilities(your responsibilities and achievements):Compile and submit feasibility report.Plan,get quotation and then report budget.Invite public bidding.Examin and receive project materials.Supervise installation.Project Description(goals, scales, etc):Set up 3 assembly productive lines during working as facility supervisor in Midea corporation.

2002/05 -- 2005/10:40T steaming boiler building project(4 sets)
Responsibilities(your responsibilities and achievements):Contacting suppliers,budgeteering,negociating with them,inviting public bidding,signing contact,supervising building,check and acceptProject Description(goals, scales, etc):It spent 4 years in rebuilding 4 sets of steaming boilers of 40T,averagely 1 set by 1 year.At the same time,trouble-shooting the steam turbines.I participate in the whole of this project as deputy of LONGDI GROUP CO.

上一页  [1] [2] [3] [4]  下一页


Tag:英文简历模板英文简历范文,英文简历范本简历大全 - 英文简历模板