• 欢迎访问(88简历网),记住本站网址:www.88jianli.com
当前位置:88简历网简历大全简历大全英文简历模板采购经理英文个人简历范文» 正文

采购经理英文个人简历范文

[10-20 21:06:36]   来源:http://www.88jianli.com  英文简历模板   阅读:280

概要:采购经理英文个人简历范文原文 查看采购经理英文个人简历范文中文翻译参照 Resume number: 415037302 Updating date: 2008-11-09 19:32:33 no photo Name: Miss. Carol Zhang Nationality: China (Mainland) Current Place: Dongguan Height/Weight: 155 cm55 kg Marital Status: married Age: 36 years Career Objective Application type: Jobseeker Pre

采购经理英文个人简历范文,标签:英文简历范文,英文简历范本,http://www.88jianli.com
采购经理英文个人简历范文原文 查看采购经理英文个人简历范文中文翻译参照
Resume number: 415037302 Updating date: 2008-11-09 19:32:33 no photo
Name: Miss. Carol Zhang Nationality: China (Mainland)
Current Place: Dongguan Height/Weight: 155 cm55 kg
Marital Status: married Age: 36 years
Career Objective
Application type: Jobseeker
Preferred job title: Dynamic/Energy/Mineral: Purchasing Manager 、 Senior Management: PMC Manager 、 Manufacture/Operation: Supply Chain Manager
Working life: 11 Title: No title
Job type: Full time Expected Start date: In a month
Expected salary: ¥8,000--¥12,000 Preferred working place: Guangdong province Henan Hubei
Work experience
Company's name:Areva Disconnector(Guangdong) Co.,LtdBegin and end date: 2008-01-
Enterprise nature:Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment
Job Title: Procurement Manager
Job description: 1.Organise all the raw material&Plant equipment purchasing.
2.Build up all the purchasing/Logistic process.
3.Take charge in localisation job.

Achievements:Save 10M RMB during below action:
1.Complete tax&duty free within a very short lead time.
2.Find proper local equipment supplier to get better service/lower price.
3.Set up proper logistic project to build/improve the whole supply chain.
4.Support to localisation project.
Reasons for leaving: Working place is too far away from home
Company's name:Dongguan Elcoteq Co.,LtdBegin and end date: 2005-12-2007-12
Enterprise nature:Soly foreign funded enterprisesIndustry: Mechanics/Electrical Equipment/Heavy Industry
Job Title: Planning Supervisor
Job description: 1.Make mid-long term plan base on customer demand &supply status,
2.Once cap conflict in midseason, as coordinator with different department; Maximize cap utilization
3.KPI monthly review &individual performance monitor
4.Direct HC control.
5.Continuously push DSCM to improve in a systematic way
Reasons for leaving: Individual Development
Company's name:Dongguan Molex Co.,LtdBegin and end date: 2002-09-2005-12
Enterprise nature:Soly foreign funded enterprisesIndustry: Computer/Internet/Communication/Electronics
Job Title: PMC Supervisor
Job description: 1.Base on annual sales Forecast, budget &plan for enterprise resource.
2.During trial-run stage of new project, as a leader to supervise &Co-ordinate with relevant dept to ensure the whole process run smoothly to achieve a stable level rapidly to match the customer needs for mass production.
3.Instruction for vendor selection &delivery confirmation management.
4.Purchasing management; continuously to improve the good parter relationship with supplier, push to speed up the cash flow of the whole supplier chain ,reduce inventory risk, ensure communication unblocked.
Reasons for leaving: Leave with boss when structure changed
Company's name:Dongguan Ferroxcube Co.,LtdBegin and end date: 2000-06-2002-09
Enterprise nature:Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment
Job Title: Head of Purchasing&Logistic
Job description: 1.Arrange the production delivery date in accordance with the customer order and factory capacity.
2.Mainly managed to push ERP system on-line includes production plan control&shipment and purchase control, inventory control(warehouse),planned and organized detailed for establishing master data and operator training ,which settle the stable foundation for running the system smoothly in the factory.
3.Cost down of packing material by choosing better quality and lower price level, I accustomed to retain a certain upwardly “atmosphere” and sentiments to foster each staff. regarding the task occurred in this field.
Reasons for leaving: Individual Development
Company's name:Dongguan Minolta Co.,LtdBegin and end date: 1997-11-2000-05
Enterprise nature:Soly foreign funded enterprisesIndustry: Mechanics/Electrical Equipment/Heavy Industry
Job Title: Purchasing Controller
Job description: 1.Vendor management and parts delivery confirmation,
2.Trail to settle the quality complain of the material, asked to adjust production plan due to material shortage,
3.Assist the manager of pushing SCM
Reasons for leaving: Individual Development

[1] [2] [3]  下一页


Tag:英文简历模板英文简历范文,英文简历范本简历大全 - 英文简历模板