[10-20 21:06:36] 来源:http://www.88jianli.com 英文简历模板 阅读:280次
概要:自动化工程师英文简历原文 查看自动化工程师英文简历中文翻译参照 Resume number: 181529302 Updating date: 2008-11-12 10:10:44 no photo Name: Mr. Jack Tan Nationality: China (Mainland) Current Place: Foshan Height/Weight: 170 cm58 kg Marital Status: Single Age: 34 years Career Objective Application type: Jobseeker Preferred job t
自动化工程师英文简历,标签:英文简历范文,英文简历范本,http://www.88jianli.com
自动化工程师英文简历原文 查看自动化工程师英文简历中文翻译参照
Resume number: |
181529302 |
Updating date: |
2008-11-12 10:10:44 |
no photo
|
Name: |
Mr. Jack Tan |
Nationality: |
China (Mainland) |
Current Place: |
Foshan |
Height/Weight: |
170 cm58 kg |
Marital Status: |
Single |
Age: |
34 years |
Application type: |
Jobseeker |
Preferred job title: |
Electronics/Electrical/Semiconductor/Instrument:
electrical
、
Elecrical Engineer/Technician:
、
Manufacture/Operation:
|
Working life: |
3 |
Title: |
|
Job type: |
Full time |
Expected Start date: |
In a month |
Expected salary: |
¥5,000--¥8,000 |
Preferred working place: |
Foshan
Guangzhou
Guangdong province |
Company's name: | AGC Automotive Glass (Foshan)Co.,Ltd.Begin and end date: 2007-05- |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Other Industries |
Job Title: | Equipment Electrical Engineer | Job description: | 1.AGC(Foshan) Plant Construction Project management including equipments sourced and pruchased; project process advanced ; installation and acceptance inspection.
2.The tempered and laminated glass Production lines ,facility equipments installed and debugged.
3.Keep improvement of production equipments ,daily mantenance and mantenance team management.
4.Equipment preventive mantenance planed and executed.
5.Device local sourced,costdown controlled ,Supplier management
6.Trouble shooting of all plant control systems.
7.Negotiated with local associate organization department for power supply ,water supply etc.
8.Trained skill worker.
Achievements:
1.New plant site construction project finished tally with standards and on schedule.
2.Dept builded and dept management, rule making ,finished tempered and laminate glass production line installation ,debugging.
3.machines shutdown time reduced. | Reasons for leaving: | |
|
Company's name: | OSRAM China Lighting Ltd.Begin and end date: 2004-10-2007-05 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Other Industries |
Job Title: | Electrical Project Engineer | Job description: | 1.Designed the electrical control systems of automatic production line ; sourced and pruchased eletrical parts installed ; made program and automation systems debuged.
2.In charge of the projects budget,planed and executed projects and advanced the project process .
3.Improvement of production process and equipments.
Achievements:
1.The automotive lamp production line Projects designed ,installed and debugged.
2.Energy-saving lamp production line Projects designed ,installed and debugged.
3.Sewage water treatment system ,focus machine,capping machine designed ,installed and debugged.
4.Improvement of production process ,increased product ability. | Reasons for leaving: | |
|
Company's name: | Premier Camera Co.,Ltd.Begin and end date: 2000-05-2004-10 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Other Industries |
Job Title: | Electrical Engineer | Job description: | 1.In charge of the facility quipments daily repaired and mantenance such as power supply system,aircompress system,water supply.
2.Planed and executed preventive mantenance of facility and production line equipments.
3.Factory buildings maintenance.
4.Interior audited in the plant site about ISO systems.
Achievements:
1.Ensured that all industry equipments were in compliance with safety, health and environmental standards.
2.Building & Equipment management and mantenance rule made. | Reasons for leaving: | |
|
[1] [2] [3] [4] 下一页
Tag:英文简历模板,英文简历范文,英文简历范本,简历大全 - 英文简历模板